{"id":18044,"date":"2022-05-17T10:00:37","date_gmt":"2022-05-17T08:00:37","guid":{"rendered":"https:\/\/goldbecksolar.deteringdesign.com\/doellen-solar-park-cee-group-expands-solar-energy-portfolio-with-154-megawatt-peak-lighthouse-project-in-brandenburg\/"},"modified":"2025-01-31T10:54:33","modified_gmt":"2025-01-31T09:54:33","slug":"doellen-solar-park-cee-group-expands-solar-energy-portfolio-with-154-megawatt-peak-lighthouse-project-in-brandenburg","status":"publish","type":"post","link":"https:\/\/goldbecksolar.deteringdesign.com\/en\/doellen-solar-park-cee-group-expands-solar-energy-portfolio-with-154-megawatt-peak-lighthouse-project-in-brandenburg\/","title":"D\u00f6llen solar park: CEE Group expands solar energy portfolio with 154 megawatt peak lighthouse project in Brandenburg","content":"<p>The Hamburg-based CEE Group, asset manager for renewable energies, is further expanding its solar energy portfolio with a major project in Brandenburg. The new solar park to be built in D\u00f6llen will have a peak output of 154.4 megawatts peak (MWp) when completed. The seller was supported in the project development by the company antlike Solar from Mecklenburg-Western Pomerania, which will remain involved during the upcoming construction phase. This new addition brings the CEE Group&#8217;s portfolio to a total of 38 photovoltaic systems and 44 onshore wind turbines. The total installed capacity of the CEE Group&#8217;s renewable energy portfolio will then amount to 1,340 MW (622 MW in the wind sector and 718 MWp in the solar sector).    <\/p>\n","excerpt":{"rendered":"<p>The Hamburg-based CEE Group, asset manager for renewable energies, is further expanding its solar energy portfolio with a major project in Brandenburg. The new solar park to be built in D\u00f6llen will have a peak output of 154.4 megawatts peak (MWp) when completed. The seller was supported in the project development by the company antlike [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":{"alt":"","title":"Solarpark Zietlitz","caption":"Ein gro\u00dfer Solarpark wie der in Zietlitz soll auch in D\u00f6llen entstehen.","width":2560,"height":1317,"sizes":{"thumbnail":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-165x165.jpg","small":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-700x360.jpg","medium":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-768x395.jpg","large":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-1920x988.jpg","full":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-scaled.jpg"},"srcset":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-700x360.jpg 700w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-1920x988.jpg 1920w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-768x395.jpg 768w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-1536x790.jpg 1536w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-2048x1054.jpg 2048w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-520x267.jpg 520w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2022\/05\/Zietlitz-neutral-Grossanlage-320x165.jpg 320w"},"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6431],"class_list":["post-18044","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-news"],"acf":[],"type_label":"News","_links":{"self":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/posts\/18044","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/comments?post=18044"}],"version-history":[{"count":1,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/posts\/18044\/revisions"}],"predecessor-version":[{"id":18705,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/posts\/18044\/revisions\/18705"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/media\/15890"}],"wp:attachment":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/media?parent=18044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/categories?post=18044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}