{"id":18106,"date":"2020-07-06T10:43:16","date_gmt":"2020-07-06T08:43:16","guid":{"rendered":"https:\/\/goldbecksolar.deteringdesign.com\/compulsory-pv-in-baden-wuerttemberg-is-a-positive-sign-for-joachim-goldbeck\/"},"modified":"2020-07-06T10:43:16","modified_gmt":"2020-07-06T08:43:16","slug":"compulsory-pv-in-baden-wuerttemberg-is-a-positive-sign-for-joachim-goldbeck","status":"publish","type":"post","link":"https:\/\/goldbecksolar.deteringdesign.com\/en\/compulsory-pv-in-baden-wuerttemberg-is-a-positive-sign-for-joachim-goldbeck\/","title":"Compulsory PV in Baden-W\u00fcrttemberg is a positive sign for Joachim Goldbeck","content":"<h2 style=\"text-align: center;\"><strong>For the Managing Director of GOLDBECK SOLAR, the PV obligation in Baden-W\u00fcrttemberg is a step in the right direction<\/strong><\/h2>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-3903 aligncenter\" src=\"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-700x394.jpg\" alt=\"A building with a solar system on the roof\" width=\"700\" height=\"394\" srcset=\"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-700x394.jpg 700w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-768x432.jpg 768w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-1536x864.jpg 1536w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-520x293.jpg 520w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-320x180.jpg 320w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar.jpg 1600w\" sizes=\"auto, (max-width: 700px) 100vw, 700px\" \/><\/p>\n<p style=\"text-align: center;\"><strong> <\/strong>PV will be mandatory in Baden-W\u00fcrttemberg from 2022. This makes it the first federal state to require photovoltaic systems on private and public non-residential buildings. Joachim Goldbeck, Managing Director of GOLDBECK SOLAR, sees this development as positive, but also points out the challenges that still lie ahead.  <\/p>\n","excerpt":{"rendered":"<p>For the Managing Director of GOLDBECK SOLAR, the PV obligation in Baden-W\u00fcrttemberg is a step in the right direction PV will be mandatory in Baden-W\u00fcrttemberg from 2022. This makes it the first federal state to require photovoltaic systems on private and public non-residential buildings. Joachim Goldbeck, Managing Director of GOLDBECK SOLAR, sees this development as [&hellip;]<\/p>\n","protected":false},"author":3,"featured_media":{"alt":"","title":"PV-Pflicht_GoldbeckSolar","caption":"Foto: Goldbeck Solar","width":1600,"height":900,"sizes":{"thumbnail":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-165x165.jpg","small":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-700x394.jpg","medium":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-768x432.jpg","large":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar.jpg","full":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar.jpg"},"srcset":"https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-700x394.jpg 700w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-768x432.jpg 768w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-1536x864.jpg 1536w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-520x293.jpg 520w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar-320x180.jpg 320w, https:\/\/goldbecksolar.deteringdesign.com\/wp-content\/uploads\/2020\/07\/PV-Pflicht_GoldbeckSolar.jpg 1600w"},"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[6431],"class_list":["post-18106","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-press-news"],"acf":[],"type_label":"News","_links":{"self":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/posts\/18106","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/users\/3"}],"replies":[{"embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/comments?post=18106"}],"version-history":[{"count":0,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/posts\/18106\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/media\/14594"}],"wp:attachment":[{"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/media?parent=18106"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/goldbecksolar.deteringdesign.com\/en\/wp-json\/wp\/v2\/categories?post=18106"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}